
OpenJDK randomly(?) removes all eMudhra root CAs
Merge 8e492bf50b8ef7b61090178c905c70ddaae8328f - #33554
以下正文同步自 Hacker News 最新,版权归原站所有,已转换为易读排版。
Code
Pull requests406 (406)
Security and quality
Insights
More items
Merge 8e492bf50b8ef7b61090178c905c70ddaae8328f - #33554
#33554
Merged
openjdk[bot] merged 1 commit intoopenjdk:masteropenjdk/jdk:masterfrom bchristi-git:8395690bchristi-git/jdk:8395690Copy head branch name to clipboard
Oct 24, 2026
ConversationCommits1 (1)ChecksFiles changed
Merged
Merge 8e492bf50b8ef7b61090178c905c70ddaae8328f#33554
openjdk[bot] merged 1 commit intoopenjdk:masteropenjdk/jdk:masterfrom bchristi-git:8395690bchristi-git/jdk:8395690Copy head branch name to clipboard
Conversation
bchristi-git
commented
Oct 24, 2026
•
edited by openjdk Bot
Loading
Uh oh!
There was an error while loading. Please reload this page.
Copy link
Copy Markdown
Member
This brings in change for 8395690: CA certificate improvements
Checkout this PR locally:
$ git fetch https://git.openjdk.org/jdk.git pull/33554/head:pull/33554
$ git checkout pull/33554
Update a local copy of the PR:
$ git checkout pull/33554
$ git pull https://git.openjdk.org/jdk.git pull/33554/head
Checkout this PR locally:
$ git pr checkout 33554
View PR using the GUI difftool:
$ git pr show -t 33554
Download this PR as a diff file:
https://git.openjdk.org/jdk/pull/33554.diff
There was an error while loading. Please reload this page.
8395690: CA certificate improvements
…
8e492bf
Reviewed-by: rhalade, weijun, mullan
bridgekeeper Bot
commented
Oct 24, 2026
Copy link
Copy Markdown
👋 Welcome back bchristi! A progress list of the required criteria for merging this PR into master will be added to the body of your pull request. There are additional pull request commands available for use with this pull request.
There was an error while loading. Please reload this page.
Loading
Uh oh!
There was an error while loading. Please reload this page.
Copy link
Copy Markdown
@bchristi-git This change now passes all automated pre-integration checks.
ℹ️ This project also has non-automated pre-integration requirements. Please see the file CONTRIBUTING.md for details.
After integration, the commit message for the final commit will be:
Merge
Reviewed-by: rhalade, mullan
You can use pull request commands such as /contributor and /issue to adjust it as needed.
At the time when this comment was updated there had been no new commits pushed to the master branch. If another commit should be pushed before you perform the /integrate command, your PR will be automatically rebased. If you prefer to avoid any potential automatic rebasing, please check the documentation for the /integrate command for further details.
➡️ To integrate this PR with the above commit message to the master branch, type /integrate in a new comment.
There was an error while loading. Please reload this page.
openjdk Bot
added
clean
Identical backport; no merge resolution required
security
labels
Oct 24, 2026
openjdk Bot
commented
Oct 24, 2026
Copy link
Copy Markdown
@bchristi-git The following label will be automatically applied to this pull request:
When this pull request is ready to be reviewed, an "RFR" email will be sent to the corresponding mailing list. If you would like to change these labels, use the /label pull request command.
There was an error while loading. Please reload this page.
openjdk Bot
added the rfr
Pull request is ready for review label
Oct 24, 2026
rhalade
approved these changes
Oct 24, 2026
View reviewed changes
rhalade
suggested changes
Oct 24, 2026
View reviewed changes
rhalade
left a comment
Copy link
Copy Markdown
Member
There was a problem hiding this comment.
Choose a reason for hiding this comment
The reason will be displayed to describe this comment to others. Learn more.
There was an error while loading. Please reload this page.
rhalade
approved these changes
Oct 24, 2026
View reviewed changes
seanjmullan
approved these changes
Oct 24, 2026
View reviewed changes
bchristi-git
commented
Oct 24, 2026
Copy link
Copy Markdown
Member
Author
/integrate
There was an error while loading. Please reload this page.
openjdk Bot
added the ready
Pull request is ready to be integrated label
Oct 24, 2026
openjdk Bot
commented
Oct 24, 2026
Copy link
Copy Markdown
Going to push as commit e2d940b.
There was an error while loading. Please reload this page.
openjdk Bot
added the integrated
Pull request has been integrated label
Oct 24, 2026
Hide details View details
openjdk Bot
merged commit e2d940b into
openjdk:master
Oct 24, 2026
1 check passed
Uh oh!
There was an error while loading. Please reload this page.
openjdk Bot
removed
ready
Pull request is ready to be integrated
rfr
Pull request is ready for review
labels
Oct 24, 2026
openjdk Bot
commented
Oct 24, 2026
Copy link
Copy Markdown
@bchristi-git Pushed as commit e2d940b.
💡 You may see a message that your pull request was closed with unmerged commits. This can be safely ignored.
There was an error while loading. Please reload this page.
Copy link
Copy Markdown
Webrevs
01: Full - Incremental (8e492bf5)
-->
All reactions
-->
There was an error while loading. Please reload this page.
Loading
Uh oh!
There was an error while loading. Please reload this page.
Copy link
Copy Markdown
Is there any information available to explain why this change was made?
There was an error while loading. Please reload this page.
Successfully merging this pull request may close these issues.
There was an error while loading. Please reload this page.
正文由 探How 从来源站点 RSS 同步,内容未经改写;遇到排版缺失或需要图片、视频时请以原文为准。